Product description
In order to resolve the problem of water accumulation in the Dazhi area caused by severe rainfall, increase the drainage capacity 20cms.
Project scope
◆Setup 5 Part 4cms Pumping unit
◆Provide unit automatic auxiliary control function
Product functions
Strengthen the function of flood prevention and provide citizens with a high-quality environment free from flooding.
Completion Date
December,2020
-
Jingmei Pumping Station Expansion Project (E&M Phase I)
Build 5 new pumping units and accessory equipment to effectively reduce inundation in watershed areas to improve the living quality of local residents
-
Yucheng Pumping Station Pump Unit Renewal Project
Reduce operating complexity, enhance pumping capacity, reduce noise and exhaust, and enhance pump unit reliability to strengthen flood drainage functions