By integrating equipment building and on-site construction experience, the CMSC increases the added value of project implementation and the proportion of independent technology to successfully develop checker support for air heaters to help clients get rid of the technology, cost, and delivery time limitations of overseas manufacturers and meet their emergency replacement demands.

Production Description

By integrating equipment building and on-site construction experience, the CMSC increases the added value of project implementation and the proportion of independent technology to successfully develop checker support for air heaters to help clients get rid of the technology, cost, and delivery time limitations of overseas manufacturers and meet their emergency replacement demands.

Product specifications

Air heater expansion and installation project; the installation projects for hot air pipes, gas pipes, air pipes, cool air pipes, exhaust pipes, new/old pipelines tie-in and modification, utility pipelines, auxiliary equipment, and steel structures; electrical and instrumentation EPC project; crane extension steel structure.

Project functions

CSC’s new #34 air heater was officially integrated to the blast furnace system in March 2019 to integrate four air heaters using dual-heater parallel air output to stabilize blast furnace operation.

PrevNext