By integrating equipment building and on-site construction experience, the CMSC increases the added value of project implementation and the proportion of independent technology to successfully develop checker support for air heaters to help clients get rid of the technology, cost, and delivery time limitations of overseas manufacturers and meet their emergency replacement demands.
Production Description
By integrating equipment building and on-site construction experience, the CMSC increases the added value of project implementation and the proportion of independent technology to successfully develop checker support for air heaters to help clients get rid of the technology, cost, and delivery time limitations of overseas manufacturers and meet their emergency replacement demands.
Product specifications
Air heater expansion and installation project; the installation projects for hot air pipes, gas pipes, air pipes, cool air pipes, exhaust pipes, new/old pipelines tie-in and modification, utility pipelines, auxiliary equipment, and steel structures; electrical and instrumentation EPC project; crane extension steel structure.
Project functions
CSC’s new #34 air heater was officially integrated to the blast furnace system in March 2019 to integrate four air heaters using dual-heater parallel air output to stabilize blast furnace operation.
-
Manufacture and Installation of Level 2 Blast Furnace Unit for DSC Phase II
DSC’s blast furnace is designed by system supplier SAVI, and the furnace unit is manufactured and equipment is installed by CSMC. Besides the furnace unit, the project also includes the manufacture ..
-
DSC CDQ Furnace
Four major systems: (1) coke handling system; (2) cooling gas circulation system; (3) furnace water and steam circulation system; and (4) dust removal and collection system